Connecting The Cables On The Top Of The Servo Drive Modules Sdm 511/Sdm - Danfoss VLT MSD 510 Operating Manual

Multiaxis servo drive
Table of Contents

Advertisement

Operating Guide | VLT® Multiaxis Servo Drive MSD 510 System
Procedure
1. Insert the wires into the brake/thermistor connector.
2. Plug the brake/thermistor connector [2] into the servo drive module SDM 511/SDM 512.
3. Secure the brake/thermistor cable using the cable tie [3].
4. Tighten the EMC plate screw [5]. The tightening torque is 3 Nm.
5. Plug the motor feedback connector (SUB-D, 26 pin) into the servo drive module.
6. Connect the servo drive module SDM 511/SDM 512 to PE by connecting a PE wire to the PE screw on the front side of the module
[1]. The tightening torque is 3 Nm.

5.8.3 Connecting the Cables on the Top of the Servo Drive Modules SDM 511/SDM 512

Context:
1
2
3
7
6
1 External encoder connector (E SDM 511/512)
3 Ethernet connector OUT (X2 OUT)
5 STO connector IN (STO SDM 511/512)
7 Relay connector (REL SDM 511/512)
Illustration 46:
Connectors on the Top of SDM 511/SDM 512 (Example)
Procedure
1. Connect the Ethernet cable from the output of the previous module to the input connector [2].
2. Insert the wires from the STO output of the previous module into the 24 V IN (STO input) connector.
3. Insert the 24 V IN (STO input) connector [5] into the SDM 511/SDM 512.
4. If required, insert the external encoder connector [1].
5. If I/Os are required, insert the wires into the I/O connector and insert the connector [4].
6. If a relay is required, insert the wires into the relay connector and insert the connector [7].
Danfoss A/S © 2019.10
4
5
2 Ethernet connector IN (X1 IN)
4 I/O connector (I/O SDM 511/512)
6 STO connector OUT (STO SDM 511/512)
AQ262450196490en-000101 / 175R1170| 67
Electrical Installation

Advertisement

Table of Contents
loading

Table of Contents