Procedure
1. Open the HW Config tool.
2. Select the station with the PROFINET
®
3. Select the PROFINET
I/O interface in the section Station/IO system.
4. Select the menu [Edit → PROFINET IO → Domain management].
Illustration 88:
5. In the Sync Domain tab, select the station in the upper field of the Nodes section.
6. In the lower field of the Nodes section, double-click on the device that should be configured as the sync master.
7. When the Device properties window opens, select Sync master as Synchronization role and click on OK.
Illustration 89:
122 | Danfoss A/S © 2019.10
®
devices to be involved in IRT communication.
Domain management
Device properties: Sync Master
Commissioning