Installing An Ecc800 - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 8-8 Installing a LAN switch
Step 3 Connect the LAN switch power cable to the PDU2000.
----End
Follow-up Procedure
If a 24-port LAN switch is configured, two power modules need to be installed for the LAN
switch onsite. Insert the power modules into the power slots of the 24-port LAN switch, and
tighten the captive screws on the power module panel.
Figure 8-9 Installing the power modules for a 24-port LAN switch

8.5 Installing an ECC800

Procedure
Step 1 Determine the mounting holes for an ECC800 based on the network cabinet device layout,
adjust the guide rails, and install floating nuts.
Step 2 Place the ECC800 in the network cabinet with caution.
Issue 01 (2017-07-30)
The positions of power cable ports vary depending on the LAN switch models. Connect the power cable
based on the actual power port of the LAN switch.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
129