Transfer Belt Cam Motor; Transfer Belt Contact/Release Detection Sensor - Toshiba e-STUDIO 5540C Service Manual

Multifunctional digital color systems
Hide thumbs Also See for e-STUDIO 5540C:
Table of Contents

Advertisement

4.7.8
Transfer belt cam motor (M14)
(1)
Take off the transfer belt unit.
 P. 4-144"4.7.6 Transfer belt unit (TBU)"
(2)
Disconnect 1 connector and remove 2
screws. Then take off the bracket [1].
(3)
Remove 2 screws and then take off the

transfer belt cam motor.

Notes:
Pay attention to the size (length) of the
screws. If incorrect ones are used, the motor
could be damaged.
4.7.9
Transfer belt contact/release detection sensor (S46)
(1)
Take off the transfer belt.
 P. 4-146"4.7.7 Transfer belt"
(2)
Disconnect 1 connector [1] and release 3
latches. Then take off the transfer belt
contact/release detection sensor [2].
e-STUDIO5540C/6540C/6550C/5560C/6560C/6570C
DISASSEMBLY and REPLACEMENT
Transfer belt cam motor
[ 1 ]
© 2011 - 2015 TOSHIBA TEC CORPORATION All rights reserved
4 - 148
[ 1 ]
Fig. 4-432
Screw
Fig. 4-433
[ 2 ]
Fig. 4-434

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents