Toshiba e-STUDIO 5540C Service Manual page 355

Multifunctional digital color systems
Hide thumbs Also See for e-STUDIO 5540C:
Table of Contents

Advertisement

(13) Rotate the releasing cam so that the
pressure roller and the fuser belt do not
contact, and then take off the pressure roller
frame unit.
Notes:
When installing, rotate the cam as shown in
the figure and then install the pressure roller
frame unit.
(14) Remove the C-ring and the gear from both
sides of the pressure roller.
© 2011 - 2015 TOSHIBA TEC CORPORATION All rights reserved
Pressure roller frame unit
Fig. 4-522
Fig. 4-523
C-ring
Fig. 4-524
e-STUDIO5540C/6540C/6550C/5560C/6560C/6570C
4 - 181
C-ring
Gear
DISASSEMBLY and REPLACEMENT
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents