Installation; Pc Installation - ABB FlexLoader Vision Product Manual

Table of Contents

Advertisement

10 Installation

10.1 PC installation

Mechanical installation
The PC shall be mechanically installed in an electrical cabinet. It can be oriented
vertically or horizontally. Ensure sufficient air circulation around the heat sink.
PC dimensions with suitable screw location information is shown in the following
picture.
xx1800002002
For detailed information about the PC please refer to the manufacturers manual.
It is located in the FlexLoader Vision documentation folder on the PC.
Electrical installation
Connect other peripherals like mouse, display and keyboard to the PC.
Product manual - FlexLoader Vision
3HAC051771-001 Revision: B
Note
When FlexLoader Vision is pre-installed as part of a function package or standard
cell, all hardware installation is already done.
WARNING
Be sure to turn off the power to the unit and all peripherals, as well as unplug
the power from the unit before adding or removing devices or cameras.
© Copyright 2014-2018 ABB. All rights reserved.
10 Installation
10.1 PC installation
Continues on next page
127

Advertisement

Table of Contents
loading

Table of Contents