Mitsubishi 3000GT Service Manual page 978

Chassis and body
Hide thumbs Also See for 3000GT:
Table of Contents

Advertisement

POWER STEERING GEAR BOX
REMOVAL AND INSTALLATION
60-70 Nm
Removal steps
1. Joint assembly and gear box
connecting bolt
2. Cotter pin
3. Tie-rod end and knuckle connecting
nut
4. Left member
5. Right member
6. Stabilizer bar bracket
STEERING - Power Steering Gear Box
29 Nm*l
36 ft.lbs.*2
60-70 Nm
43-51 ft.lbs.
TSB Revision
Post-installation Operation
Transfer Assemblv installation
l
(Refer to GROUP 22 - Transfer.)
Front Exhaust Pioe Installation (Refer to GROUP
l
15 - Exhaust Pipe and Main Muffler.)
Power Steering Fluid Supplying (Refer to P.37A-10.)
l
Power Steering Fluid Line Bleeding
l
(Refer to P.37A-1 I .)
Steering Wheel Position with Wheels Straight Ahead
l
Checking
Front Wheel Alignment Adjustment
l
(Refer to GROUP 33A - On-vehicle Service.)
35 Nm
25 ft.lbs.
7. Connection of steering gear box with
4WS oil line
8. Clamp
NOTE
11 ft.lbs.
0 0 0 0 2 1 7 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

1992 3000gt1993 3000gt1994 3000gt1996 3000gt3000gt 19923000gt 1993 ... Show all

Table of Contents