Mitsubishi Electric MELSEC iQ-R Series User Manual page 312

Master/local module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

(0)
Set the acquisition processing for input data from connection No.1 and connection No.2, and start EtherNet/IP communication.
(16) When M0 is on, "M+RJ71GN11_SE_EIP_Class1GetInputData" is executed to acquire the connection No.1 input data.
When M20 is on, the input data received from target 1 continues to be stored from D0 for the data size set in connection No.1.
(364) When M1 is on, while the 'Class1 data link status' (U0\G7734272.1) of connection No.2 is normal, the input data received from target 2 is refreshed from
D200 by the data size set in connection No.2 and then copied to W100 or later.
(402) By turning on M200, input data acquisition and EtherNet/IP communication are stopped.
13 PROGRAMMING
310
13.2 Class1 Communications Communication Example

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r cc-link ie tsn plus

Table of Contents