3.
Ensure the power supply is OFF, then slide the CPU into the
CCPU slot in the Controlling Chassis.
4.
If external Background Music (BGM) or Music on Hold (MOH) is
being installed, plug the cable into the CN8 or CN9 pin jack
connector on the CPU. The other end of the cable plugs into the
music source.
3.1.3

Switch Settings

Refer to

Table 6-5 CD-CP00-AU Switch Settings

system reset and with system power on.
Blade Layout on page 6-13
the CD-CP00-AU blade.
Table 6-5 CD-CP00-AU Switch Settings
USB Memory Status
With a system restart or a system reset while holding the SW1
When USB Memory is not
installed:
Switch
SW1 – Load
When USB Memory is
Switch
installed:
When an unauthorized USB
device is installed:
Refer to the PGD(2)-U( ) ADP in the
SV8100/SV8300 Optional Equipment
PGD(2)-U( ) ADP on page 10-1
music source.
When the system software is upgraded, the flash memory is
updated with the new software version. Either the Hot or Cold
start-up method can be used or the system can be upgraded
using system software. Refer to
page
6-7,
2.6.2 Performing a Hot Start on page
Performing a Software Upgrade on page
Customer information is stored in the RAM memory and, in case
of a power failure, will be restored. The lithium battery in the
system saves the RAM memory when power is lost.
shows the location of the SW1 switch on
Installing the SV8100/SV8300 Blades
UNIVERGE SV8100/SV8300
Chapter 10 Installing
section
2.1 Using a
for details on connecting to a
2.6.1 Performing a Cold Start on
6-11.
for system restart/
Figure 6-3 CD-CP00-AU
Operation
switch:
Cold Start occurs.
USB Memory contents loaded.
System does not start and an "Illegal
USB device is connected" alarm is
recorded.
6-8, or
2.6.4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents