16.
Install the front cover (refer to
BATT BOX Front

Figure 5-97 Install CHS LARGE BATT BOX Front Cover

17.
Connect the IP3-L BATT BOX CABLE between the terminal unit
in the CHS LARGE BATT BOX and battery connector of the
chassis through holes [refer to
between Chassis and CHS LARGE BATT BOX (45 Minutes
Battery
Backup)].
When providing 45 minutes backup time:
Hole
Figure 5-98 Cable Connection between Chassis and CHS LARGE BATT BOX
UNIVERGE SV8100/SV8300
Figure 5-97 Install CHS LARGE
Cover).
Figure 5-98 Cable Connection
(45 Minutes Battery Backup)
Installing the SV8300 Chassis
Expansion
Expansion
Expansion
Controlling
CHS LARGE
BATT BOX

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents