UNIVERGE SV8100/SV8300
B
S
4
ATTERY
ECTION
There are two types of battery connection to provide battery life in the event of a power
failure, the internal battery and an external battery with CHS LARGE BATT BOX.
4.1
System Hardware Manual
C
ONNECTION
Installing the Internal Batteries
An internal battery source using two batteries can be installed using the CHS2U
BATT MTG KIT (mounting kit) and CHS2U BATT CA INT (internal cabling).
CHS2U BATT MTG KIT (Backup time = 10 Minutes/24 Terminals)
1.
Power down the CHS2U-AU chassis.
Ensure the CHS2U-AU chassis is powered OFF.
2.
Disconnect AC power and grounding cable from rear of chassis.
3.
Remove screws from battery access panel on rear of chassis. Refer to
Figure 4-47 Removing Battery Access
Figure 4-47 Removing Battery Access Panel
Issue No. 1.5
Panel.
4 - 37