Chs Large Batt Box To Chs2U-Au Connection; Figure 4-66 Installing Cover Battery - NEC UNIVERGE SV8100 System Hardware Manual

Hide thumbs Also See for UNIVERGE SV8100:
Table of Contents

Advertisement

Issue No. 1.5
4 - 48
15.
Plug the Battery Connection Cable(s) into the Fuse Unit. Refer
to
Figure 4-65 Connecting Battery Cables on page
Figure 4-65 Connecting Battery Cables
16.
Insert tabs on cover into holes on CHS LARGE BATT BOX. Slide
the cover left until seated and tighten the screw. Refer to
4-66 Installing Cover
4.2.3

CHS LARGE BATT BOX to CHS2U-AU Connection

1.
Power down the CHS2U-AU chassis.
2.
Disconnect AC power cable from rear of chassis.
Battery.

Figure 4-66 Installing Cover Battery

Ensure the CHS2U-AU chassis is powered
OFF.
Installing the SV8100 Chassis
UNIVERGE SV8100/SV8300
4-48.
Figure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents