Suzuki Wagon R Manual page 1132

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

6-1-40 GENERAL INFORMATION AND ENGINE DIAGNOSIS
TABLE A-3 ECM (PCM) POWER AND GROUND CIRCUIT CHECK – MIL
DOESN'T LIGHT AT IGNITION SWITCH ON AND ENGINE DOESN'T
START THOUGH IT IS CRANKED UP
CIRCUIT DESCRIPTION
Ignition switch
Main fuse
Relay box
When the ignition switch tuned ON, the main relay turns ON (the contact point closes) and the main power is sup-
plied to ECM (PCM).
INSPECTION
STEP
1
Main Relay Operating Sound Check
Is operating sound of main relay heard at ignition switch ON?
2
Main Relay Check
1) Turn OFF ignition switch and remove main relay (1).
2) Check for proper connection to main relay (1) at terminal
C and D.
3) Check resistance between each two terminals. See Fig. 1
and 2.
Between terminals A and B: Infinity
Between terminals C and D: 100 – 120 Ω
4) Check that there is continuity between terminals A and B
when battery is connected to terminals C and D. See Fig. 3.
Is main relay in good condition?
3
Fuse Check
Is "FI" fuse (2) in good condition? See Fig. 4.
4
ECM (PCM) Power Circuit Check
1) Turn OFF ignition switch, disconnect connectors from ECM
(PCM) and install main relay.
2) Check for proper connection to ECM (PCM) at terminals
E22-20, E21-2, E21-15 and E21-22.
3) If OK, then measure voltage between terminal E22-20 and
ground, E21-22 and ground with ignition switch ON.
Is each voltage 10 – 14 V?
Malfunction indicator lamp in combination meter
Main relay
"IG COIL"
ACTION
YES
Go to Step 5.
Go to Step 2.
Go to Step 3.
Replace main
relay.
Go to Step 4.
Check for short in
circuits connected
to this fuse.
Go to Step 5.
"BLK/WHT",
"BLK/YEL" or
"BLU/BLK" circuit
open.
NO

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents