8B-12 LIGHTING SYSTEM
HEADLIGHTS WITH LEVELING SYSTEM
LEVELING SWITCH
REMOVAL
1) Disconnect negative cable at battery.
2) Remove garnish (1) of instrument panel switches.
3) Remove leveling switch (2) from instrument panel.
INSPECTION
Check the resistance between terminal "A" and "B" and terminal "B"
and "C" at each leveling switch position. If the obtained resistance
value is out of specification, replace switch.
Position
Between terminal
"A" and "B"
1
136 – 150
2
278 – 308
3
421 – 465
INSTALLATION
Reverse removal procedure for installation.
LEVELING ACTUATOR
INSPECTION
All headlight system couples connected including leveling actuator
and switch, and at ignition switch ON, listen to the leveling actuator
sound on both actuators according to the movement of the leveling
switch. If no sound is heard with the movement of the leveling
switch, replace headlight assembly.
Resistance (Ω)
Between terminal
"B" and "C"
———
522 – 576