Suzuki Wagon R Manual page 1205

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

6A-14 ENGINE MECHANICAL
INSTALLATION
1) Install throttle body to intake manifold. (Refer to Section 6E1.)
2) Install intake manifold gasket to cylinder head. Use a new gas-
ket.
3) Install intake manifold (1) with throttle body to cylinder head.
D Install clamps (3) as shown in figure, and tighten bolts and
nuts to specification.
Tightening Torque
(a): 23 N
2. Ground
4) Connect breather hose to PCV valve.
5) Connect vacuum hoses.
6) Connect coolant hoses.
7) Connect fuel return and feed hoses to throttle body.
8) Connect electric lead wire.
1. Throttle body
2. ISC actuator
coupler
3. TP sensor
coupler
4. Fuel injector
coupler
5. EFE heater
coupler
9) Install EVAP surge tank with EVAP canister purge valve.
10) Connect accelerator cable to throttle body.
11) Install air cleaner assembly to throttle body.
12) Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been reinstalled.
13) Refill cooling system.
14) Connect negative cable at battery.
15) Upon completion of installation, start engine and check for fuel
leaks and engine coolant leaks.
After warming up engine, adjust accelerator cable play to spec-
ification according to description in Section 6E1.
.
m (2.3 kg-m, 17.0 lb-ft)

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents