Run - Main Screen - Part 3 - Horizon Fitness SmartStacker User Manual

Sheet cutter
Table of Contents

Advertisement

Finishing Line Controller Screen Descriptions
1-3-3

Run - Main Screen - Part 3

1
Operations After Job Processing
Deliver: After a job is complete, the Merge
Stacker delivers the stacked blocks for
that one job.
Offset:
After a job is complete, the next job
is offset and stacked on the previous
job. The stacks are delivered when the
stacker is full or the number of job in a
stack reaches.
None:
Even though a job is complete, the
blocks from the next job continue to
stack without offsetting until the stacker
is full.
When a large stack of completed job
remains and even if the next job defines
the number of blocks, the stacker may
become full and deliver the stack before
the next job is complete.
2
Number of Jobs in a Stack
Enter the maximum number of jobs delivered before
the stack is delivered or offset.
82
3
Delivery unit priority:
This sets the prioritized delivery destination.
Merge Stacker : Normally, select this.
B2 Stacker
: Select this when giving priority to
the B2 stacker.
SmartStacker User's Manual
1
2
3

Advertisement

Table of Contents
loading

Table of Contents