Daewoo MATIZ Service Manual page 536

Table of Contents

Advertisement

DAEWOO M-150 BL2
Installation Procedure
1. Install the power booster with the new cotter pin, cle-
vis pin and nuts.
Tighten
Tighten the nuts to 16 NSm (12 lb-ft).
Important: Make sure the distance from the booster
to the center of the clevis bore should be 100mm
(3.94 in.).
2. Install the evaporator unit with the screws. Refer to
Section 7B, Manual Control Heating, Ventilation, and
Air Conditioning System.
3. Install the instrument panel assembly. Refer to Sec-
D24C003
tion 9E, Instrument/Driver Information.
4. Connect the vacuum hose to the power booster.
5. Install the master cylinder assembly. Refer to Section
4B, Master Cylinder.
POWER BOOSTER 4C – 7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MATIZ and is the answer not in the manual?

Questions and answers

Δημήτρης
May 8, 2025

Δεν βρίσκω στην ιστοσελίδα σας, Κεραία κλειδαριάς τιμονιού ,.. Imobilaizer .. Τον δακτύλιο αυτού, που με ένα φισάκι με δύο καλώδια πάει και κουμπώνει στον αφαλό Ευχαριστώ

User image 681cbcac994d1

This manual is also suitable for:

My2003

Table of Contents

Save PDF