Daewoo MATIZ Service Manual page 78

Table of Contents

Advertisement

1E – 22 ENGINE ELECTRICAL
2. Remove the brush holder assembly.
D Remove the starter motor terminal M nut (1).
D Remove the brush holder assembly (2).
D102E712
3. Remove the field frame assembly from the armature
set (1).
D102E713
4. Remove the solenoid assembly.
D Remove the solenoid screws (1).
D Remove the magnetic switch (2).
D Remove the spring (3).
D102E714
5. Remove the armature set and solenoid from the start-
er housing.
D Remove the armature set (1).
D Remove the rubber sealer (2).
D Remove the shift lever plate (3).
D Remove the shift lever (4).
D Remove the solenoid (5).
D Remove the gasket (6).
D102E715
DAEWOO M-150 BL2

Advertisement

Table of Contents
loading

This manual is also suitable for:

My2003

Table of Contents