7B -- 26 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
D Tighten the bracket nut to 5 NSm (44 lb-in) (2).
D18B530B
D Tighten the bolt securing the A/C low pressure pipe
line at the compressor to 23 NSm (17 lb-ft) (3).
2. Evacuate and recharge the system. Refer to "Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedure for A/C System" in this section.
3. Connect the negative battery cable.
D18B531A
EVAPORATOR UNIT AND DRAIN
HOSE
(Left- -Hand Drive Shown, Right- -Hand
Drive Similar)
Removal Procedure
1. Disconnect the negative battery cable.
2. Discharge and recover the refrigerant. Refer to "Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C System" in this section.
3. Loosen the high pressure pipe line (receiver dry-
er → evaporator) nut and the low pressure pipe line
D108B532
(evaporator → compressor) nut.
4. Remove the glove box. Refer to Section 9E, Instru-
mentation/Driver information.
5. Remove the evaporator unit.
D Remove the drain hose (1).
D Disconnect the thermistor connector (2).
D Remove the screws (3).
D Remove the evaporator backward slowly (4).
D108B533
DAEWOO M-150 BL2