MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM 7B -- 27
DAEWOO M-150 BL2
Installation Procedure
1. Install the evaporator evaporator with the screws.
2. Connect the thermistor connector.
3. Install the drain hose.
4. Install the glove box. Refer to Section 9E, Instrumen-
tation / Driver Information.
5. Tighten the high pressure pipe line (receiver dry-
er → evaporator) nut and the low pressure pipe line
(evaporator → compressor) nut to 14 NSm (10.5 lb-ft).
6. Evacuate and recharge the system. Refer to "Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C System" in this section.
D18B534A
7. Connect the negative battery cable.