Daewoo MATIZ Service Manual page 54

Table of Contents

Advertisement

1D – 16 ENGINE COOLING
Installation Procedure
1. Install the coolant pump with the new gasket.
9–12 NSm
D12D520A
2. Install the rear timing belt cover.
9–12 NSm
3. Install the timing belt. Refer to Section 1B, Engine
4. Connect the lower radiator hose and drain the cool-
5. Connect the negative battery cable.
D12D521A
Tighten
Tighten the bolts and the nuts to 9–12 NSm (80–106
lb-in) (a).
Tighten
Tighten the bolts to 9–12 NSm (80–106 lb-in) (b).
Mechanical.
ant. Refer to "Draining and Refilling the Cooling Sys-
tem" in this section.
DAEWOO M-150 BL2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MATIZ and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

My2003

Table of Contents

Save PDF