1D – 16 ENGINE COOLING
Installation Procedure
1. Install the coolant pump with the new gasket.
9–12 NSm
D12D520A
2. Install the rear timing belt cover.
9–12 NSm
3. Install the timing belt. Refer to Section 1B, Engine
4. Connect the lower radiator hose and drain the cool-
5. Connect the negative battery cable.
D12D521A
Tighten
Tighten the bolts and the nuts to 9–12 NSm (80–106
lb-in) (a).
Tighten
Tighten the bolts to 9–12 NSm (80–106 lb-in) (b).
Mechanical.
ant. Refer to "Draining and Refilling the Cooling Sys-
tem" in this section.
DAEWOO M-150 BL2
Need help?
Do you have a question about the MATIZ and is the answer not in the manual?