ZH
INSTALLATION
INSTALLATION - COVER SUPPORT CABLE
1. Install the support cable (4) to the top frame with
the retaining screw (3). Tighten screw to 5 N·m (44
in. lbs.).
2. Install the cover side retainers to the top frame by
sliding the retainer into the frame and pushing up
to lock into place (one on each side).
3. Install the new retaining rivets (1) (one on each
side).
CONVERTIBLE TOP 23 - 541