24 - 156
PLUMBING
4. Install the heating water return line (1).
5. Install the guide (2) for the heating water flow pipe.
6. Install the cover (1).
7. Clip the spring clamps.
8. Install the bolts on the cover.
9. Install HVAC housing. (Refer to 24 - HEATING &
AIR
CONDITIONING/DISTRIBUTION/HVAC
HOUSING - INSTALLATION).
ZH