Chrysler 2005 Crossfire SRT6 Service Manual page 4292

Table of Contents

Advertisement

ZH
INSTALLATION
1. Install the coolant circulation valve.
2. Install the rubber mounts to the mounting points on
the body side.
3. Connect the electrical connector (1) on the coolant
circulation valve.
4. Install the heater water hose (2).
5. Tighten the hose clamps on heater water hose.
6. Unclamp the hot water hose.
7. Tighten the top screw for the heat shield.
8. Top off the cooling system.(Refer to 7 - COOLING/
ENGINE/COOLANT - STANDARD PROCEDURE).
PLUMBING 24 - 163

Advertisement

Table of Contents
loading

Table of Contents