24 - 98
DISTRIBUTION
INSTALLATION - RHD
1. Install the blower motor and squirrel cage as an
assembly.
2. Install the screws (1) attaching the blower motor to
the heater housing.
3. Swing the blower motor door up.
4. Install the blower motor door catch mounts (1) by
sliding them over to the detents.
ZH