Toyota 4-Runner 1985 Repair Manual page 67

Gasoline
Table of Contents

Advertisement

EM-38
ENGINE MECHANICAL - Cylinder Head
POST INSTALLATION
1.
INSTALL VANE PUMP WITH BRACKET
(WITH POWER STEERING)
Install the vane pump with the six bolts. Torque the bolts.
Torque:
450 kg-em (33 ft-Ib, 44 N
am)
2.
INSTALL DRIVE BELT AND ADJUST BELT TENSION
(See page MA-17)
3.
INSTALL DISTRIBUTOR AND SPARK PLUGS
4.
INSTALL BOND CABLE OF REAR SIDE
5.
CONNECT FOLLOWING PARTS:
6.
(a)
Vacuum switch, EBCV (Ex. Calif.) and VSV with the
bracket
(b)
HAC to bracket (Ex. Calif.)
(c)
Fuel return hose to the fuel return pipe
(d)
Fuel main hose to the fuel inlet pipe
(e)
Brake booster hose
(f)
Charcoal canister hose
CONNECT FOLLOWING WIRES:
(a)
EACV wire (for Calif.)
(b)
Fuel cut solenoid valve wire
(c)
Thermo switch wire
(d)
Cold mixture heater wire
(e)
Water temperature sender gauge wire
(f)
VSV wire for EV AP
(g)
Vacuum switch wire
(h)
VSV wire for AIC
7.
CONNECT ACCELERATOR CABLE TO CARBURETOR
Connect the cable to the carburetor and bracket.
8.
CONNECT TWO HEATER HOSES
9.
CONNECT RADIATOR UPPER HOSE TO THERMOSTAT
HOUSING
10. CONNECT EXHAUST PIPE TO EXHAUST MANIFOLD
Connect the exhaust pipe with the three nuts to the ex-
haust manifold.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Truck 1985

Table of Contents