Toyota 4-Runner 1985 Repair Manual page 391

Gasoline
Table of Contents

Advertisement

MT-60
MANUAL TRANSMISSION - G 52
Transmission
GM0079
GMOO29
GMOO30
GMOO29
20. INSTALL COUNTER FIFTH GEAR WITH HUB SLEEVE NO.3
ASSEMBLY AND NEEDLE ROLLER BEARINGS
(a)
Apply gear oil to the needle roller bearings.
(b)
Install the counter 5th gear with hub sleeve No.3 and
needle roller bearings.
21. INSTALL SYNCHRONIZER RING AND GEAR SPLINE PIECE
NO.5
(a)
Install the synchronizer ring on gear spline piece No.5.
(b)
Using SST, drive in gear spline piece No.5 with the
synchronizer ring slots aligned with the shifting keys.
SST 09316-60010
NOTE:
When installing gear spline piece No.5, support
the counter gear in front with a 3-5 Ib hammer or equivalent.
22.
INSTALL LOCK NUT
(a)
Engage the gear double meshing.
(b)
Install and torque the lock nut.
Torque:
1,200 kg-em (87 ft-Ib, 118 N·m)
(c)
Stake the lock nut.
(d)
Disengage the gear double meshing.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Truck 1985

Table of Contents