ENGINE MECHANICAL - Cylinder Block
EM-71
5.
INSTALL COUPLING FAN WITH FAN
6.
CONNECT TWO HEATER HOSES
7.
INSTALL AIR CLEANER
(a)
Connect air hoses No.1 and No.4 to the cleaner.
(b)
Install the air cleaner.
B.
FILL WITH ENGINE OIL
Fill the engine with new oil, API grade SF or SF/CC multi-
grade, fuel efficient and recommended viscosity oil.
Capacity:
Dry fill
4.8 liters
(5.1 US qts, 4.2 Imp. qts)
Drain and refill
w/o
Oil filter change 4.0 liters
(4.2 US qts, 3.5Imp. qts)
w
I
Oil filter change 4.6 liters
(4.9 US qts, 4.0 Imp. qts)
9.
FILL WITH COOLANT
Close the radiator and engine drain cocks and fill with
coolant.
Total capacity:
w/Heater 8.4 liters
(B.9 US qts, 7.4 Imp. qts)
10. INSTALL ENGINE UNDER COVER
11. INSTALL AND ADJUST HOOD (See page BO-2)
12. CONNECT CABLE TO NEGATIVE TERMINAL OF BATTERY
13. START ENGINE
Warm up the engine and inspect for leaks.
14. PERFORM ENGINE ADJUSTMENT
15. ROAD TEST
Perform a road test.
16. RECHECK COOLANT AND ENGINE OIL LEVEL