Model 4200-SCS Reference Manual
NOTE
6.
Figure 6-188
KITE Run Test/Plan icon
Figure 6-189
KITE Abort Test/Plan button
NOTE
Figure 6-190
KITE Execution Indicator button
4200-901-01 Rev. S / May 2017
If you select a node other than the project node, KITE runs only the test or the test
sequence at the node, and runs it only one time. Also, KITE labels the resulting data
with the site number that is specified in the Site Navigator, not the Start Execution at
Site number specified in the Project window. Refer to the next subsection,
execution of individual tests and test
Start execution. Click the green triangular Run Test/Plan icon at the top of the KITE screen
(see below), select Run in the KITE Run menu, or press the F6 keyboard key.
The green Run Test/Plan toolbar button becomes gray, the Project Plan executes, and the
square Abort Test/Plan toolbar button illuminates red for the duration of the execution (see
below).
If you should need to abort the subsite-plan execution, click the red Abort Test/Plan
toolbar button or press the PAUSE/BREAK keyboard key.
Simultaneously, the Execution Indicator toolbar button (see below) traces miniature curves
and changes color for the duration of the project-plan execution.
Figure 6-191
illustrates the execution process for the exe_demo Project Plan, which was
configured as shown in
Return to
Section Topics
Section 6: Keithley Interactive Test Environment (KITE)
sequences."
Figure
6-186.
"Run
6-161

Advertisement

Table of Contents
loading

Table of Contents