Figure 6-62
Result of pressing Copy to add a same-named ITM within a given Subsite Plan
Figure 6-63
Result of pressing Copy to add a same-named ITM to a different Subsite Plan
Note that a new Subsite Plan was added to the u_build Project Plan, without discussion,
for tutorial purposes.
When the Test Already Exists message box appears, do one of the following:
Option I. Rename the ITM: If you do not specifically need a same-named ITM or if the rules for
same-named ITM are contrary to your test objectives, rename the ITM before inserting it, as
follows:
1.
Figure 6-64
Copy Test dialog box
2.
3.
4.
5.
4200-901-01 Rev. S / May 2017
Click Rename in the Test Already Exists message box. The Copy Test dialog box appears.
See
Figure
6-64.
Enter a new name.
Click OK. The new ITM appears under Test Sequence Table.
If, under Test Sequence Table, an ITM is not at the preferred position in the sequence, do
this:
a. Select the ITM to be moved.
b. Use the Move Up button or the Move Down button to reposition the ITM.
Click Apply. The new ITM is added to the Project Plan.
Return to
Section Topics
Section 6: Keithley Interactive Test Environment (KITE)
Select "vds-id" ITM and
press Copy
Select "vds-id" ITM
and press Copy
6-65

Advertisement

Table of Contents
loading

Table of Contents