After First Commissioning - BONFIGLIOLI Agile Operating Instructions Manual

Frequency inverter 230 v / 400 0.09 kw ... 11 kw
Hide thumbs Also See for Agile:
Table of Contents

Advertisement

6.4

After first commissioning

After execution of the "Setup" function, the device can be adjusted to the relevant application via the
following parameters. Not all setting options are listed. The parameters can be set in the menu "Para".
Control level
Parameter
P28
1
Easy: Parameters for quick commissioning.
2
Standard: The most common parameters can be set.
3
Professional: Extended access to parameters.
Local/Remote, control via contacts or keypad
P412
0
The commands start, stop and direction of rotation (parameters
68,
3
The commands start, stop and direction of rotation can be entered via the op-
erator panel.
4
The commands start, stop and direction of rotation can be entered via the op-
erator panel or via digital inputs. Factory setting.
5
Control of direction of rotation (parameter
wise
Further settings are applicable for control via bus system.
Agile
Operating Instructions
69) can be entered via digital inputs.
Start Anticlockwise
69) and signal
Start 3-Wire Ctrl.
06/2013
Start Clockwise
87 via digital inputs.
80
Commissioning
(Factory setting)
Start Clockwise
68,
Start Anticlock-
After first commissioning

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents