Daihatsu F300 Service Manual page 1229

Hide thumbs Also See for F300:
Table of Contents

Advertisement

ENGINE MECHANICALS
7. Install the throttle body to the surge tank with a new gasket
interposed.
Tightening Torque:
14.7- 21.5 N-m (1.5- 2.2 kgf-m)
8. Install the injector vibration insulator to the intake manifold
section.
CAUTION:
Prior to installation,
check
the insulator for damage and
cracks. Replace any faulty insulator with a new part.
9. Remove the "0" ring of the injector. Remove the grommet
and check
it
for damage or cracks.
NOTE:
If the grommet exhibits any
faun,
replace it wtth a new
one.
10. Install the grommet and new
"0"
ring to the injectors.
11. Insert the injector to the vibration insulator hole of the intake
manifold.
12. Install the delivery pipe insulator to the stud bolt of the
intake manifold.
EM-88

Advertisement

Table of Contents
loading

Table of Contents