Daihatsu F300 Service Manual page 1157

Hide thumbs Also See for F300:
Table of Contents

Advertisement

ENGINE MECHANICALS
6. Inspection and adjustment of valve clearances
The measurement and adjustment of valve clearances are
carried out when each of the pistons of the No. 1 and No. 4
cylinders is set to the top dead center at the end of the
compression stroke.
NOTE:
The
valve clearance adjustment is performed normally
when
the
engine is in a hot condition.
"Hot engine condition" denotes a condition in which the
cooling water temperature is 75 - 85°C and the engine
oil temperature is above 65°C.
However, when the engine has been overhauled, it is
necessary to adjust the valve clearances while the en-
gine is cold and to readjust the valve clearances in a hot
condition after warming up the engine.
1. Removal of cylinder head cover
[HD-C
Engine]
(1) Remove the three bolts securing the air cleaner and air
intake hose.
(2) Remove the wing nut located at the center of the air
cleaner. Remove the air cleaner and air intake hose
subassembly.
(3) Detach the spark plug wires from the clamp.
EM-16

Advertisement

Table of Contents
loading

Table of Contents