Diagnostic Procedure 2: Power Fault Suspected - Nortel Meridian Meridian 1 Maintenance Manual

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

164
Chapter 4: Diagnosing faults

Diagnostic procedure 2: Power fault suspected

(IPE Module)
Option 11
Meridian 1?
Meridian 1
cabinet powered
up?
Go to
2.1
553-3211-510 Standard 1.0 October 1998
NO
YES
NO
YES
NO
Meridian 1
column powered
up?
YES
Go
to
2.2
Check Meridian 1
Option 11 cabinet
power.
Refer to Application
Equipment Module
Installation Guide
(553-3201-200).
Ensure that the
pedestal breaker is
turned on.
Verify connections
from the pedestal to
power source and
ground.
Verify power cable
connections from
pedestal to top cap
through power
monitor boards.
Ensure that jumper
settings on power
monitor boards are
correct and that
the board is properly
seated.
Check for PWR xxx
messages at the
Meridian 1 system
console.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents