Nortel Meridian Meridian 1 Maintenance Manual page 257

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Table 7
maint messages that appear on the console (continued)
Command
Message
applstart
Customer Controlled Routing was
(continued)
not started successfully
switch link process missing: tsroot
Application(s) were not started
successfully. You must use the
maint powerdown command to
reboot the system in order to
restart sys-wdog. You may then
retry the applstart command.
backconfig
Attempt to unschedule backup
failed
Attempt to change backup
schedule failed
Attempt to schedule backup failed
backdata
Backup successful
Meridian Link Release 5C/CCR Release 3C Diagnostic and Maintenance Guide
Chapter 5: Application Module and IPE Module error messages 245
Ñ continued Ñ
Description
The application was not started.
Use the viewlog command to search
for any applicable errors in the
SysLog file.
The tsroot process was not found. It
is likely that the application software
has not been installed successfully.
The system watchdog process is
not running. Power down and reboot
the system or use Procedure 2:
SBC restart.
The crontab mstr file was corrupted.
It is likely that the application
software was not installed properly.
The backup operation was not
successful. Use the viewlog
command to search for any
applicable errors in the SysLog
file.
The problem is most likely with the
tape medium. Verify that the tape
is positioned in the drive correctly,
and that it is write enabled. Before
entering the command, wait for the
tape drive LED to go out after
inserting the tape.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents