Figure 126
Insert tape into the tape drive
Application tape
2
of
2
Tape
Notch
points down
Meridian Link Release 5C/CCR Release 3C Diagnostic and Maintenance Guide
Procedure 22: Load the application software from tape (continued)
IPE Module drive
Arrow
points in
in
side
This
Eject
button
Chapter 8: Recovery/replacement procedures 443
Application Module drive
Lock the tape drive latch
after tape is inserted