Nortel Meridian Meridian 1 Maintenance Manual page 189

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Diagnostic procedure 4
Card fault suspected (IPE Module) (continued)
Meridian Link Release 5C/CCR Release 3C Diagnostic and Maintenance Guide
4.1
Boot process gets past
ÒTesting completeÓ?
YES
Does ÒConsole
login:Ó prompt
appear?
YES
Stop
Chapter 4: Diagnosing faults 177
Replace the IPE Module.
NO
See Procedure 16:
Replace the IPE
Module.
Possible operating
NO
system problem. Install
the latest version. See
Procedure 20: Load the
operating system.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents