Nortel Meridian Meridian 1 Maintenance Manual page 225

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

5
Check the link 0 configuration on the Meridian 1.
¥
Link 0 must be configured as DTE. The software Physical DTE
must be set to 0 for DTE configuration.
¥
The link speed must be 19200 bps.
¥
For DTE configuration, the internal address (IADR) must be 1,
and remote address (RADR) must be 3.
mlusr> display link 0
The following display appears (the pertinent values of the
Link 0 configuration are underlined):
Protocol: HDLC
Machine ID: SL16
Delay: 0
Port type: H
PDN type: 0
Baud rate: 19200
RFS timer: 150
Remote address: 3
Maximum out frames (K): 7
¥
If the display link configuration parameters are not the same as the
above example, the parameters need to be changed using the
change link 0 command (see Chapter 3, ÒLink maintenance
commandsÓ).
6
Confirm that the application software package is installed on the
Meridian 1.
¥
Type LD22 at the Meridian 1 console, and press [Return].
¥
At the REQ prompt, type PRT and press [Return].
¥
At the TYPE prompt, type PKG and press [Return]. A list of all
software packages installed on the Meridian 1 will be displayed.
¥
Ensure that the list includes entries for the software packages.
If the required packages are not listed, contact your Nortel support
personnel.
Meridian Link Release 5C/CCR Release 3C Diagnostic and Maintenance Guide
Chapter 4: Diagnosing faults 213
Link type: 1
Physical DTE(0)/DCE(1): 0
Maximum Frame length: 135
Fail timer: 50
Internal address: 1
T1: 20
Maximum trans attempts (N2): 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents