444 Chapter 8: Recovery/replacement procedures
553-3211-510 Standard 1.0 October 1998
Procedure 22: Load the application software from tape (continued)
!
8
When the tape indicator light is off, press [Return] to start the auto-
loading of the application software.
The system response is ÒInstalling Meridian ApplicationsÓ.
9
You are prompted to press [Return] to continue. Press [Return].
A series of software install messages appears for approximately 10
minutes (Figure 127). If an error occurs, contact your Nortel support
personnel.
Figure 127
Software install messages 1
190 blocks
Preparing for installation. Please wait.
Preparing for installation successful.
10 blocks
30 blocks
7780 blocks
1100 blocks
110 blocks
1080 blocks
2080 blocks
430 blocks
11000 blocks
11320 blocks
(A series of messages appears on the screen.)
.
Installation Complete.
Host based X.25 is installed.
Setting file permissions and ownerships. Please wait.
Setting file permissions and ownerships completed.
06/01/94 19:56:44 Invoking maint
CAUTION
Risk of hardware damage
Do not attempt to press a keyboard key until the
tape active indicator light goes from on to off and
stays off. The tape drive can enter a non-operational
state if operations are attempted before the drive is
completely ready.