Nortel Meridian Meridian 1 Maintenance Manual page 440

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

428 Chapter 8: Recovery/replacement procedures
553-3211-510 Standard 1.0 October 1998
Procedure 20: Load the operating system tape on an IPE Module or an
Application Module with an MVME167 card (continued)
Figure 96
Software installation summary
Selected to run mkcomply to verify correct installation.
Check the information below.
the previous questions will have to be answered again.
* Format and install the new bootloader on the MVME167,
controller #0, disk drive #00,
using the ddefs(1M) description Ôm147sea3283Õ.
* Create a root file system using 1 Kbyte logical blocks
on slice 0 on the MVME167, controller #0, disk drive #00.
* Create a swap area in slice 1 on the
MVME167, controller #0, disk drive #00.
* Create a usr file system using 1 Kbyte logical blocks
on slice 2 on the MVME167, controller #0, disk drive #00.
* Install On-line Manual Pages Object Package (OLMP).
* Do Not Install On-line Problem Descriptions (Tars on Tape)
---> Is all of this information correct (y, n, q, ?):
28
If the summary information is correct, type y and press [Return]. If it
is not correct, type n, press [Return], and then enter the information
correctly when prompted.
When the information is correct and you reply y to the above
prompt, phases 3 and 4 of the installation begin.
Note: Phases 3 and 4 may take from 30 to 90 minutes to complete.
If any part of the information is incorrect,
y

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents