Basic Sequence; Basic Sequence Of Operations - Canon iR C3200 Series Service Manual

Hide thumbs Also See for iR C3200 Series:
Table of Contents

Advertisement

Chapter 8

8.2 Basic Sequence

8.2.1 Basic Sequence of Operations

The laser scanner motor starts to rotate when the Start key is pressed (or the print request signal is issued). When its
rotation has stabilized, the printer unit becomes ready for formation of images, causing the printer side to generate
the sync signal (PTOP).
The machine uses the signal to generate the sub scanning direction signals (Y-TOP, M-TOP, C-TOP, K-TOP) for
individual colors, and turns on the lasers of the corresponding colors.
Print request signal
(Start key ON)
Polygon motor
(Y,M,C,Bk)
PTOP signal
Y-TOP signal
Laser Y ON
M-TOP signal
Laser M ON
C-TOP signal
Laser C ON
Bk-TOP signal
Laser Bk ON
8-4
Image formation
enable timing
PSTBY
PINTR
Used to stabilize
rotation(3.5sec)
F-8-4
PRINT
LSTR
0000-4455
PSTBY

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir c3220n prt

Table of Contents