Goldacres G6 Crop Cruiser 2 Series Operator's Manual page 64

Hide thumbs Also See for G6 Crop Cruiser 2 Series:
Table of Contents

Advertisement

Preparation for Use – Setting Up
4
Fit the Starfire adaptor cable & Starfire Receiver cable
connectors.
6 Fit the other end connector of the Starfire
adaptor cable to the Starfire Receiver
connector.
7 Fasten the Starfire Receiver mount onto
the roof and fit the receiver cable.
Fasten the Starfire Receiver mount onto the cabin roof.
64
Fit & connect the Starfire Receiver onto the roof mounting.
8 Fit the Starfire Receiver onto the roof
mount and connect the cable connector.
9 On completion of fitting the Starfire
Receiver, refit the antenna cover & screws
above the left hand cabin door.
Ball mount fitted on the rail ready for the Autosteer Console.
Fit & connect the John Deere Console.
To Fit the John Deere Autosteer
Console:
2 Fit the Greenstar cable connector to the
virtual terminal ISO connector located on
the rail in right hand side of the cabin.
3 Fit the John Deere Autosteer Console to
the ball mount on the rail at the right hand
side of the cabin.
4 Fit the other end of the Greenstar cable
connector to the connector on the back of
the Autosteer Console
The electrical compartment cover refitted & locked into
position.
6 On completion of the Autosteer
installation, refit the cover of the Electrical
Compartment and fold down the latches
to lock the cover into position.
7 Close & lock the right hand cabin door and
lower the armrest control console into its
working position.
GA8701177 REV 2 APRIL 2022

Advertisement

Table of Contents
loading

Table of Contents