Outline Procedure to Start the GOT
This section explains the outline procedure to operate the GOT.
Start
Preparing project data
Installing the battery
Installing the GOT, and power supply wiring
Writing package data
Connecting the GOT and the controller
Starting monitoring
End
Preparing project data
1.
Install GT Designer3 Version1 on the personal computer.
For how to install GT Designer3 Version1, refer to the following.
GT Works3 Version1 Installation Instructions
2.
Create project data with GT Designer3 Version1.
For how to use GT Designer3 Version1 and create project data, refer to the following.
GT Designer3 (GOT2000) Screen Design Manual
Installing the battery
Install the battery to the GOT.
For how to install the battery, refer to the following.
Page 72 Installing the Battery
Installing the GOT, and power supply wiring
1.
Install the GOT to the control panel.
For how to install the GOT, refer to the following.
Page 70 Installing the GOT
2.
Carry out wiring of power cables for the GOT.
For the wiring of power cables, refer to the following.
Page 85 WIRING OF POWER SUPPLY SECTION