Installing The Management / Standard Ethernet Module - Planet XGS3-42000R User Manual

4-slot layer 3 ipv6/ ipv4 routing chassis switch
Table of Contents

Advertisement

2.2.4 Installing the Management / Standard Ethernet Module

The installation procedure is the same for all cards, as shown below:
Step1
Power down the XGS3-42000R.
Step2
Ensure proper grounding of the XGS3-42000R.
Step3
Put on an ESD wrist strap before contact with the switch circuit, and make sure the ESD wrist strap is
connected securely to the ESD connector in the switch's front panel.
Step4
Loosen the panel fasteners locking back plate counterclockwise and remove the back plate.
Step5
Insert the optional module into the slot; you can use the metal handle on the front plate of the module to
ensure good contact. Then lock the module with panel fasteners in the front plate as shown in
Figure 2-2-5 Insert the optional module into the slot of XGS3-42000R
Hot-s wapping is supported by optional modules for the Chassis Switch. However,
for better convenience, it is recommended to power down the Chassis Switch before
installing the cards, if no module in the switch is running.
Slot 1 should installed with Management Module before power on the switch
otherwise the Chassis Switch will not operates normally.
The Chassis Switch supports maximum 2 Management module for purpose of
management redundancy at slot 1 and slot 2.
2-16
Figure
2-2-5.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents