Figure 6-55

6.10 Hardware Acceptance

This section is intended for installation and test personnel. This section describes an
inspection of the general system installation but does not attempt to cover testing of the
system software.
danger:
No commercially AC powered equipment may be used or placed within 7 ft. of –48V
equipment. This may create a shock or current loop that can be severely hazardous
to personnel and equipment.
Hardware operational testing is designed to verify the functionality of the finalized
construction of the hardware at the customer site. The demarcation line for the testing is up to
and including the patch panel directly connected to the system. The ability to route traffic
through this system is verified using a Message Generator Traffic Simulator (MGTS). All
cabling, alarm output, clock input, and other Oracle equipment is also verified operational per
the Hardware Operational Test Manual provided with the test equipment.
Caution:
All personnel associated with the installation of this system must adhere to all safety
precautions and use required protection equipment, to avoid the possibility of injury
to personnel, service degradation, and/or service interruption.
Caution:
This is a redundant system, to allow service during normal maintenance. When
repairs require a total power disconnect, both input supply sources must be
disconnected. This will cause service interruption and takes down the system.
Converter Rear Detail
Chapter 6
Hardware Acceptance
6-107