Procedure - Replacing A Frame Clock Cables - Oracle EAGLE Installation Manual

Table of Contents

Advertisement

Figure 6-38
6.6.1 Procedure — Replacing A Frame Clock Cables
This procedure explains the replacement of one A frame clock cable. The steps show
the replacement of one frame clock cable and are repeated for every frame clock
cable that is to be replaced.
Remove the plastic panels from the back of all shelves that require the frame clock
1.
cables be replaced.
Install Pin Protector Assembly on all shelves that require the frame clock cables be
2.
replaced.
Cable 830-0398-xx or 830-1150-xx
A Clock and B Clock Cable Replacement
Chapter 6
6-84

Advertisement

Table of Contents
loading

Table of Contents