Oracle EAGLE Installation Manual page 200

Table of Contents

Advertisement

Figure 6-40
Backplane P/N 850-0356-04 Extension Shelf
Remove the other end of the frame clock cable from the next shelf's A CLKIN connector.
9.
Select the new frame clock cable (P/N 830-0398-xx or P/N 830-1150-xx) and connect it to
10.
the A CLKOUT connector, refer to
Route the clock cable in the frame following the routing directions in this manual.
11.
Connect the other end of the new frame clock cable (P/N 830-0398-xx or P/N 830-1150-
12.
xx) from A CLKOUT, refer to 10, to the next shelf's A CLKIN connector.
Issue the command to report clock status.
13.
rept-stat-clk
Response to the clock status command is displayed.
tekelecstp 03-02-10 05:34:03 HST Rel XX.x.x-XX.x.x
rept-stat-clk
Command entered at termoinal #1.
;
tekelecstp 03-02-10 05:34:03 HST Rel XX.x.x-XX.x.x
CARD LOC= 1114 (Standby)
PRIMARY BITS
SECONDARY BITS
HS PRIMARY CLK
HS SECONDARY CLK = Idle
8
CARD LOC= 1116 (Active)
= Active PRIMARY BITS
= Idle
SECONDARY BITS
= Active HS PRIMARY CLK
A Clock and B Clock Cable Replacement
= Active
= Idle
= Active
Chapter 6
6-87

Advertisement

Table of Contents
loading

Table of Contents