Download Print this page

Back Panel Components; Install The Hardware - Oracle ZFS Storage ZS7-2 Getting Started Manual

Hide thumbs Also See for ZFS Storage ZS7-2:

Advertisement

Back Panel Components

1 Power Supply Unit (PSU) 1
4 PSU 0 status indicators (top to bottom):
■ Attention (amber)
■ Power/OK (green)
7 Slot 3:
■ High-end model: External SAS-3 HBA
■ Mid-range model: Filler panel
10 Cluster interface card (slot 6)
13 Network (NET) 100/1000BASE-T RJ-45
Gigabit Ethernet (GbE) port: NET 0
16 Fourth PCIe option (slot 7)
19 External SAS-3 HBA (slot 10)

Install the Hardware

For detailed information, see the Oracle ZFS Storage Appliance Installation Guide available from
oracle.com/en/storage.
2 PSU 1 status indicators (top to bottom):
■ Attention (amber)
■ Power/OK (green)
5 Fifth PCIe option (slot 1)
8 First PCIe option (slot 4)
11 Serial management (SER MGT) RJ-45
serial port
14 USB 3.0 port
17 Second PCIe option (slot 8)
20 Internal SAS-3 HBA (slot 11)
3 PSU 0
6 External SAS-3 HBA (slot2)
9 Third PCIe option (slot 5)
12 Service Processor (SP) NET MGT port
15 System status LEDs:
■ Locate (white) - left
■ Attention (amber) - right, top
■ Power/OK (green) - right, bottom
18 Slot 9:
■ High-end model: External SAS-3 HBA
■ Mid-range model: Filler panel
https://docs.
3

Advertisement

loading