Oracle EAGLE Installation Manual page 44

Table of Contents

Advertisement

Note:
Do not over adjust as this may cause the tile or frame to tilt.
If removed, reinstall the floor tiles.
9.
Install the isolation sheet.
10.
Mount the frame onto the threaded rods.
11.
Caution:
Two people are needed to position the frame onto threaded rods.
Install hold down plates, washers, and nuts in the bottom of the frame.
12.
Finger tighten the nuts on threaded rods located inside the frame above the raised
13.
floor.
Tighten the nuts below the raised floor.
14.
Securely tighten the nuts inside the frame.
15.
Replace tiles if necessary.
16.
The following figure shows a heavy duty frame installed on a raised floor.
Chapter 4
Floor Preparation
4-10

Advertisement