4.2 Floor Preparation

This section describes how to lay out the floor plan for on-site flooring, and how to
prepare a raised floor or a concrete floor for frame installation. For specific types of
flooring refer to
General Floor Preparation
The floor layout for the frame is site specific. The most typical frame layout is
constructed with Extension Frames to the right of the Control Frame when viewed from
the front. The OAP Frame (if applicable) is typically on the left of the Control Frame.
Miscellaneous Frames and other support or feature specific frames are lined up to the
left of the Control Frame. Refer to the figure below.
Typically, the aisle space from the rear of the frame to the front of other frames or
equipment is three feet. The end of the frame layout must be no less than 12 inches
from other telco frames.
Note:
The recommended minimum aisle spacing is 2-1/2 ft. (75 cm) front and rear.
Figure 4-6

4.2.1 Recommended Tools

Oracle tools should be labeled "Property of ORACLE" with either a press-on Field Tool
Identification label Field Tool Identification wrap.
Safety glasses
Chalk-line, with chalk
Fiberglass tape measure
Concrete Floor
or
Anchoring to Overhead Rack of Heavy Duty Frame
Typical Frame Layout
Chapter 4
Floor Preparation
.
4-6